TA2024 Neste Porvoo
Year: 2024
Number of workers: 11 persons
Scope of work: various repair works, welding works with TIG and MMA welding methods, mechanical works.
New Kemi bioproduct mill | Metsä Fibre
Year: 2023
Number of workers: 10 - 25 persons
Scope of work: welding and installation of new pipelines.
Umicore Finland, Kokkola
Year: 2023
Number of workers: 10 - 30 persons
Scope of work: welding and installation of new pipelines.
Helen project, Vuosaari
Year: 2021 - 2022
Number of workers: 4 - 29 persons
Scope of work: welding and installation of new pipelines.
TA2021 Neste Porvoo
Year: 2021
Hours of work: 18 857
Number of workers: 33 persons
Scope of work: various repair works, welding works with TIG and MMA welding methods, mechanical works.
Stora Enso Oulu Mill, OCO Project
Year: 2020
Hours of work: 8623,5
Number of workers: 14 - 22 persons
Scope of work: various repair works, welding works with TIG and MMA welding methods. Material carbon and stainless steel.
Naantali Power Plant
Year: 2019
Hours of work: 5717
Number of workers: 8 - 9 persons
Scope of work: welding and fitting works on stainless steel piping. Welding method TIG and MMA.
Costa Smeralda, Turku Repair Yard
Year: 2019
Hours of work: 5936,5
Number of workers: 7 - 9 persons
Scope of work: various interior works inside the ship.
Prefabrication of pipes, Tampere
Year: 2019
Hours of work: 1500
Number of workers: 4 persons
Scope of work: prefabrication of pipes at our workshop in Lithuania and final assembly at client's workshop. Welding method - 141, material - stainless steel.
Manufacturing and assembly of underground tanks, Neste, Porvoo
Year: 2018
Hours of work: 1869
Number of workers: 3 persons
Scope of work: manufacturing and assembling of tanks from carbon steel in the clients workshop. Welding method - 135/136 (MIG/MAG). Thickness - 10mm.
Stora Enso Oyj, Heinola
Year: 2017
Hours of work: 1337
Number of workers: 5 - 10 persons
Scope of work: manufacturing and assembling of tank from stainless steel. Welding method - 141 (TIG) and 135/136 (MIG/MAG). Thickness - 3 - 5mm.
TA2017 BOREALIS, Porvoo
Year: 2017
Hours of work: 1211
Number of workers: 4 - 11 persons
Scope of work: various repair works.
TA2017 Naantali Refinery at Neste
Year: 2017
Hours of work: 2697
Number of workers: 6 - 7 persons
Scope of work: various repair works.
Production of Biogas equipment
Year: 2017 m.
Hours of work: 1205
Number of workers: 5 persons
Scope of work: welding and fitting of industrial pipelines from carbon and stainless steel. Welding method TIG (141). Thickness up to 6mm.
Metsä Fibre Äänekoski Bioproduct mill project
Year: 2017
Hours of work: 5918
Number of workers: 11 persons
Scope of work: Welding and fitting of various pipelines, fitting of various equipment, prefabrication and fitting of supports. Pipelines of stainless steel, chrome and carbon steel. Thickness from 1mm to 12mm. Welding methods 141 and 111.
Welding and fitting of heat exchanger for Neste refinery
Year: 2017
Hours of work: 910
Number of workers: 2 persons
Scope of work: assembly and welding of heat exchanger (stainless steel ,P9) in the client workshop. TIG (141) welding method. Wall thickness - 10 mm, elbows ~15 mm.
Kemira Mercury project, Kouvola
Year: 2017
Hours of work: 5,897
Number of workers: 6 -16 persons
Scope of work: assembly and welding of pipelines (stainless steel). TIG (141) welding method. Wall thickness - 2,3 mm.
Metsä Fibre Äänekoski Bioproduct mill project
Year: 2016
Hours of work: 4,502
Number of workers: 4 - 9 persons
Scope of work: assembly and welding of tanks (carbon and stainless steel). 136 and 111 welding methods.
Prefabrication and assembly of tanks at client's workshop
Year: 2016
Hours of work: 2,096
Number of workers: 3 persons
Scope of work: assembly and welding of new tanks (carbon and stainless steel).136 and 111 welding methods. Wall thickness – 6 mm.
FE2, Kotkamills
Year: 2016
Hours of work: 6,188
Number of workers: 6–15 persons
Scope of work: repair of old stainless steel pipes and the installation of new lines. 141 welding method.